Location:
Elanora Robot Cut & Patch
Timeframe:
1 day- completed in time and on budget.
Description:
Sewer pipe had bulged so badly the ensuite toilet could not be used. As the pipes were located through a building footing and under tiled lounge room, excavation was not ideal. We recommended robot cutting along the pipe to remove broken pipe and roots, then installing glass re-enforced liner patch to repair.
The clients are so happy to have their ensuite back in operation! 😃
Services Used
Challenges:
Because we were equipped with the right tools, we didn’t face any major challenges for this job.