Location:

Stormwater Rehabiliation in Redbank Plains

Timeframe:

We scheduled 8 days and completed the job in 6.5 days!

Description:

The scope of the job was to rehabilitate reinforced concrete (RC) stormwater pipes by both inversion and patch relining. 

 

The Numbers

4 x 375mm diameter patches x 1m long
20 x 450mm diameter patches x 1m long
19m x 375mm Inversion Liner (a single seamless liner to repair multiple joints)

Google Rating
5.0
Based on 63 reviews
×
js_loader

 

Services Used
Challenges:

Many of the patches were done between manholes in a busy road – we organised traffic control and set up gazebos on the road to enable fast and efficient work.

 

The relining needed to be assessed, organised and scheduled with a fast turnaround, so the client’s roadways could be sealed to prevent erosion and the roads were sealed on time!

Request an on-site quote

Talk to us today for a comprehensive on-site quote for pipe relining,
water jetter, CCTV pipe inspection and more!

Get Your Quote
or call us on 07 3358 3201

Confirm your Plumbing Health Check

To confirm your plumbing health check simply fill out the form below and one of our friendly staff will be in touch to book in your appointment.

Start your enquiry here

  • This field is hidden when viewing the form
  • This field is for validation purposes and should be left unchanged.