Location:

Rialto Towers Water Sub-Meter Installation

Timeframe:

2 Days

Description:

Emu Plumbing. Relining. Gas Fitting were commissioned to undertake the installation of cold water sub-meters to QUU specifications- locating them on ground floor common area in galvanised meter boxes at Tower Lodge 37 Rialto Street, Coorparoo.

Google Rating
5.0
Based on 62 reviews
×
js_loader

 

Services Used
Challenges:

The project works included:

  • Supply & install 4 x galvanised meter boxes on rear wall of garages & label “Water Sub-Meters”.
  • Supply & install 6 x QUU approved meters in the new meter boxes to the QUU specifications. Label each meter with name tag for ease of identification.
  • Have core holes drilled through concrete footpath/ramp as required to bring pipes through to units 
  • Supply & install new 20mm copper cold water pipes from existing copper main nearby, to new meters.
  • Supply & install 6 x new 20mm copper water pipes from each meter up brick wall to the respective unit
  • Supply & install new 1/4 turn isolation valves for each unit to replace old T-Head taps
  • Cap off the old galvanised water services in the walls.
  • Secure & test all works.
  • Supply form4 to QBCC.
  • Supply Body Corporate with table showing all meter locations, serial numbers & readings at completion of works.

All works were completed over a (predicted) 2 day period. The Body Corporate is now able to monitor water usage, cost and all owners are able to be more water efficient as a result.

Request an on-site quote

Talk to us today for a comprehensive on-site quote for pipe relining,
water jetter, CCTV pipe inspection and more!

Get Your Quote
or call us on 07 3358 3201

Confirm your Plumbing Health Check

To confirm your plumbing health check simply fill out the form below and one of our friendly staff will be in touch to book in your appointment.

Start your enquiry here

  • Hidden
  • This field is for validation purposes and should be left unchanged.